Strong relationship delivers customer’s high standards

Skanska built the Featherstone Building, EC1, a mixed-use commercial scheme for its long-standing customer, Derwent London.

We fully managed the development, in collaboration with key sub-contractors, delivering everything from piling works to building construction, mechanical and electrical engineering services and network solutions for digital connectivity.

The completed building has 123,000 sqft of office space and 2,400 sqft of retail space.

Designed to complement neighbouring historic buildings

It is designed to complement the architecture of Victorian warehouses of the area, with exposed concrete soffits and generous windows, it also boasts a range of modern features. These include a chilled concrete slab cooling system to absorb heat generated in the offices, plus exceptional digital connectivity, delivered by Skanska’s network solutions experts.

Achieving our joint sustainability goals

Skanska took a modern approach in construction techniques as well as features, engaging with the customer early to optimise the original design and reduce the materials, labour and resources needed through design for manufacture and assembly (DfMA).

The external facade was manufactured off-site reducing risk and simplifying on-site installation resource, removing the need for complex scaffolding, laying bricks by hand, and successfully mitigated health and safety risks associated with working at height. It also reduced carbon emissions as less materials, power and water were used, as well as cost savings for the customer.

Elements of the mechanical and electrical engineering services were also prefabricated offsite, helping to significantly reduce installation time for the plantrooms, energy centre, generator enclosure and the office trench heating and cooling pipework. The lifts were also configured and integrated offsite at the manufacturer’s facilities – again helping to significantly reduce the amount of time it takes to install and commission these on site.

All of this contributed to achieving a net-zero building, as well as targeting BREEAM Outstanding and LEED Platinum environmental accreditations in recognition of the building’s sustainable features. These include solar photovoltaic panels providing on-site renewable energy, with enhanced sub-metering that enables occupiers to monitor their electricity and heat consumption.

Other sustainable features include biodiverse green roofs that support nature and wildlife, as well as efficiency fixtures and fittings reducing water consumption. The cladding system includes windows that open to provide natural ventilation to the offices.